Corporate TI Projects

Exterior Repairs

 

Eastgate

Corporate TI installed 8 scaffold towers up approx. 40' around the exterior of the Eastgate Building to complete multiple EFIS repairs due to bird damage. (Photo- scaffold tower at SE face of the building)

TI Projects 

 

100 Lakeside

Corporate TI removed everything in the space including a demising wall to allow the tenant to capture the neighboring suite. All of the offices were reconfigured The IT room was relocated and the kitchen was relocated. The entire interior was rebuilt utilizing high end finishes and tons of glass to let in the natural light.

TI Projects continued

 

Redmond Kirkland Animal Hospital

This project was vacant vanilla shell space that

was built out into a new animal hospital facility including 5 new exam rooms, reception, animal daycare, treatment room and ADA restroom.  High end finishes were used through out the space including epoxy floors, stained concrete floors, metal casework, specialty treatment sinks, faux stone backdrop behind the reception desk, Glass top reception desk and sound control wall board in the daycare area.

 

The vacant shell area had vaulted ceiling up to 22' that were integrated into the lobby and the suite was slab on grade thus the bulk of the plumbing had to be run under the slab requiring

sawcut and trenching for all of the new sinks and Restroom. 

        

Kirkland Way 

Corporate TI  handled extensive exterior repairs and clean

up due to water damage at the building.  Including gutter work exterior GWB soffit repairs, Plumbing rework for floor drains, Garage ceiling repairs to grid and tile, pressure washing of major walk ways, painting and roof cleaning.

 

 

Main Lobby

 

 

Issaquah office building

Corporate TI furnished and installed new vapor barrior throughtout

the 35,000 sq/ft parking garage of the building as the existing

product had failed in several locations. (Photos of the install are

below)

 

 HRG

This was a full restoration including reconfiguration of offices, add of kitchen and all new finishes thru out the suite. Rustic feel with reclaimed wood floor and reclaimed windows.

 

 

Bel-Red Rd

Corporate TI Demoed all bad sections of asphalt, ground down the Ty joints, removed a large amount of curbing and prepped the site for overlay with HMA.  Web cracked areas recieved petro mat the site was overlaid and restriped.  Curbs were added for water control and new curb was installed.  The finished product looks great and should last for years to come.

 

Water Damage / Repair

In the area seen walls and ceiling repaired/ replaced as needed due to water damage the carpet was completely removed and the entire common area hall/open space was prepped, stained and polished.  I took the pick after the UPS guy delivered so the lines in the front are not cleaned up.

ALTN

 

Scope of work: Create separation between the work area and Lobby, Renovate the lobby to give it an updated look and create an exam room for privacy.

Treatment Room                                        Exam Room

 

 

Restroom and common area Upgrades 

All new finishes and fixtures at RRs including common area paint and new entry tile with integrated walk off mat.

 

VS Common area RRs

In a commercial building in Redmond Wa, Corporate TI Demoed

4ea multi stall restrooms and refinished them.  The new finishes included new 12" by 24" porcelain tile with base in all of the restrooms, new countertops, new sinks, faucets and soap dispencers, new lighting and all of the walls and ceilings were refinished in a two tone modern look. 

 

 

 

 

G2

This was a vacant suite that became a 6 station salon with 3 wash stations, reception and break room.  CTI worked closely with the tenant to provide the necessary power for the suite (This involved an upgrade of the panel feed/breaker), We also worked with G2 regarding the plumbing requirements including the addition of a wash station, and the installation of a new HWH along with a new RP device to isolate the water on all three of the wash stations. The Trim and walls were painted out and the wood flooring was patched in the open area where walls were demoed.  Also a new break room cabinet and sink were installed. 

 

 Waiting area                                             Main Salon

 

Hair Washing Stations